Sign In | Join Free | My himfr.com
Home > Steel Structure Workshop >

Long Span Pre Engineering Steel Framework Workshop Construction

Qingdao KaFa Fabrication Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers
     
    Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers
    • Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers
    • Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers
    • Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers
    • Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers
    • Buy cheap Long Span Pre Engineering Steel Framework Workshop Construction from wholesalers

    Long Span Pre Engineering Steel Framework Workshop Construction

    Ask Lasest Price
    Brand Name : KAFA
    Model Number : KAFA-2022058
    Certification : ISO, SGS
    Price : USD 45-80 per square meter
    Supply Ability : 20,000 square meter per month
    Delivery Time : 4-6 weeks after deposit and shop drawing
    Payment Terms : L/C, T/T
    • Product Details
    • Company Profile

    Long Span Pre Engineering Steel Framework Workshop Construction



    Widely Usage Long Span Pre-Engineering Steel Framework Workshop Construction


    Long Span Pre Engineering Steel Framework Workshop Construction Long Span Pre Engineering Steel Framework Workshop Construction


    Long Span Pre Engineering Steel Framework Workshop Construction


    Compared with traditional buildings, steel structure building is a new building structure—the entire building made of steel. The structure mainly comprises steel beams, columns, trusses, and other parts made of thin-walled steel and steel plates. It is connected between parts and parts by welding, bolts, or rivets. The lightweight and simple structures are widely used in large factories, stadiums, super high-rise buildings, and other fields.


    Steel Structure Building provides affordable, durable, and low-maintenance solutions for workshops, warehouses, agricultural buildings, garage buildings, and aircraft hangars. Compared to wooden structures, steel is resistant to strong winds, heavy snow, and termites. The interior layout of the metal buildings can be fully customized to meet your needs.


    >> Prefabricated steel structure building parameters:


    Main Steel
    Steel Beam ColumnQ235B,Q355B
    Secondary Steel
    Tie BarQ235B
    PurlinC and Z purlin
    BracingQ235B
    Accessories
    SurfacePainted or Hot Dip Galvanized
    DoorRolling Up Door or Sliding Door
    WindowPVC or Aluminum Alloy
    Roof and Wall Panels

    Corrugated Steel Sheet, EPS Sandwich Panel, Rock Wool Sandwich

    Panel, PU Sandwich Panel

    Others
    ServiceDesign, Fabrication and Installation
    We can offer quotations according to customers’ drawings and requirements,free design drawings and detailed installation drawings.
    Design software: Auto CAD,PKPM,MTS,3D3S, TArch, Tekla Structures(X steel)V12.0, etc.
    PackingAccording to customers’ requirements


    >> Features and services:

    • Short construction time

    The most significant advantage of the steel building is that all components are prefabricated at the factory ​​and installed on-site. It only takes about two months for a small industrial workshop.

    • Anti-seismic performance

    The steel building is a flexible structure and light in weight. It can effectively reduce the seismic response and the impact of the disaster, which is exceptionally beneficial to earthquake .

    • Suitable for relocation

    Once the owner is dissatisfied with the site or unexpected changes in the external environment, the entire steel structure building can demolish in a short period with minimal losses.


    >>Factors affecting the price of steel structure Building:


    1. Raw material prices
    Fluctuations in the price of steel have an important impact on the price of steel structure buildings. The increase in steel prices will directly cause the overall price of steel structure buildings to rise.

    2. External load
    External loads include wind load, snow load, dead load, and live load. Structural engineers calculate the steel structure based on the external load. If the load is large, the amount of steel used in the structure will increase.

    3. The span of the steel frame
    The larger span of the steel frame, the greater the amount of steel used per steel frame. More than 30 meters is considered a large width. If the steel frame has a large span and no center pillar, the amount of steel used will increase.

    4. Structure
    For steel structure buildings with cranes or mezzanine floors, to ensure the safe operation of cranes, steel columns will be increased, and columns of an equal cross-section will be adopted, which will increase the amount of steel used in the building.

    The amount of steel used plays a vital role in steel structure buildings. Therefore, structural engineers must optimize the structure as much as possible during the design process while ensuring safety, reducing the amount of steel used, and saving costs.


    Quality Long Span Pre Engineering Steel Framework Workshop Construction for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao KaFa Fabrication Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)